Project Overview and Key Design Considerations

TACO Gotion is a joint venture initiative supporting India’s growing electric vehicle ecosystem through advanced Li-ion battery pack manufacturing. Developed by Crystal Group under its build-to-suit (BTS) model, the facility at Bavla has been planned to meet the high technical and safety requirements of energy storage manufacturing.

The plant incorporates efficient space utilization, controlled environments, and specialized infrastructure to support precision assembly and testing.

Year

2025

Location

Bavla, Gujarat

Built-up Area

18,000 sqm

Product

Li-ion Battery Packs

VMS Scope and Project Outcomes

VMS Consultants was appointed by Crystal Group for the complete planning and infrastructure design of the facility, covering master planning, architecture, structure, and MEP services. The project required careful coordination to integrate high electrical loads, temperature control, and safety systems essential for battery assembly.

Through technical expertise and coordinated design delivery, VMS ensured a well-designed facility that supported Tata Gotion’s advanced manufacturing operations that contributed to India’s transition towards sustainable mobility.

VMS

Testimonials

Hear From Our Clients

1/6

Discuss Your Project Requirements

If you have a project in mind or need clarification on our services, feel free to reach out to our team.

VMS

Connect with VMS

Share your details below and our team will connect with you.