Project Overview and Key Design Considerations
Insolation Energy Limited (INA Solar), a BSE-listed leader in the Indian solar industry, is significantly scaling its operations with a new 45-acre mega-campus in Sawarda. This greenfield project is designed to be Rajasthan’s first fully automated and AI-enabled solar manufacturing facility. The campus integrates a high-capacity 2 GW Solar PV module line (targeting 3 GW N-Type/TOPCon modules) with a massive 1,000 MT/month Aluminum Anodizing unit dedicated to solar frame production.
The architectural challenge involves managing a combined built-up area of approximately 45,000 sq. mt. while maintaining the ultra-clean standards required for high-efficiency module assembly. The layout separates the chemically intensive aluminum anodizing and extrusion areas from the sensitive module assembly lines with AI-based quality inspection.
Year
2025
Location
Sawarda, Rajasthan
Built-up Area
45,000 sqm
Product
Solar PV Module & Aluminum Anodizing
VMS Scope and Project Outcomes
VMS is proud to serve as the Design Consultancy Partner for this landmark renewable energy hub. Our multidisciplinary scope includes Master Planning, Architecture, Structural Engineering, and MEP Services, along with Tendering and Procurement support. We engineered the facility to support Industry 4.0 standards, integrating IoT-enabled monitoring and advanced Building Management Systems (BMS) to optimize energy usage across the plant.
Our structural team designed specialized foundations for the high-precision stringer and laminator machines, while our MEPF engineers developed complex chemical drainage and treatment systems for the aluminum anodizing unit.
Testimonials
Hear From Our Clients
Discuss Your Project Requirements
If you have a project in mind or need clarification on our services, feel free to reach out to our team.
Connect with VMS
Share your details below and our team will connect with you.