Project Overview and Key Design Considerations
TACO Gotion is a joint venture initiative supporting India’s growing electric vehicle ecosystem through advanced Li-ion battery pack manufacturing. Developed by Crystal Group under its build-to-suit (BTS) model, the facility at Bavla has been planned to meet the high technical and safety requirements of energy storage manufacturing.
The plant incorporates efficient space utilization, controlled environments, and specialized infrastructure to support precision assembly and testing.
Year
2025
Location
Bavla, Gujarat
Built-up Area
18,000 sqm
Product
Li-ion Battery Packs
VMS Scope and Project Outcomes
VMS Consultants was appointed by Crystal Group for the complete planning and infrastructure design of the facility, covering master planning, architecture, structure, and MEP services. The project required careful coordination to integrate high electrical loads, temperature control, and safety systems essential for battery assembly.
Through technical expertise and coordinated design delivery, VMS ensured a well-designed facility that supported Tata Gotion’s advanced manufacturing operations that contributed to India’s transition towards sustainable mobility.
Testimonials
Hear From Our Clients
Discuss Your Project Requirements
If you have a project in mind or need clarification on our services, feel free to reach out to our team.
Connect with VMS
Share your details below and our team will connect with you.